Maximo Application Suite – Manage: Preventive Maintenance and Condition Monitoring – MAX4324G

Course Name:

Maximo Application Suite – Manage: Preventive Maintenance and Condition Monitoring

MAX4324G

Skill Level:

Intermediate

Modality:

ILO – Instructor Lead Online Training

Duration:

2 Day/s

Price:
Request Quote

Overview:

This 2 day instructor led course provides students with an understanding of preventive maintenance and condition monitoring.

This 2-day instructor led course provides students with an understanding of how Preventive Maintenance is configured in Maximo Application Suite – Manage including the CR – Classroom Trainingeation of time and meter based Preventive Maintenance schedules, Master PMs, PM Hierarchies and PM Forecasting. Students will learn about topics such as Repair Facilities and Job Plan Sequencing. This course also has hands-on lab exercises using a Red Hat OpenShift Maximo Manage environment.


Enroll here

Please enable JavaScript in your browser to complete this form.
Email
Multiple Choice
How did you hear about us?
Yes, I would like to receive special offers from CRS.
Yes, I would like to receive special offers from CRS.


Target Audience:

Consultants, System Administrators, Support, Sales, Users

[List]

Prerequisites:

Topic:

Module 1: Introduction to Preventive Maintenance 

  • Discuss the Preventive Maintenance process 
  • CR – Classroom Trainingeate time-based PM schedules 
  • CR – Classroom Trainingeate meter-based PM schedules 
  • Define Job Plan sequencing on a PM 
  • CR – Classroom Trainingeate Master PMs 
  • Discuss the usage of Repair Facilities 
  • CR – Classroom Trainingeate Condition Monitoring Points 
  • Automatically generate Work Orders from PMs and Condition Monitoring Points 

 

Module 2: Time Based PMs 

  • Types of Preventive Maintenance 
  • Application Overview 
  • Work Order Configuration 
  • Lead Time 
  • Responsibility Fields 
  • Resource Information 
  • PM Frequency 
  • Fixed vs Floating PMs 
  • PM Alerts 
  • PM Date Calculations 
  • On-Demand and Zero Frequency PMs 
  • Seasonal Dates 

 

Module 3: Meter Based PMs 

  • Types of Preventive Maintenance 
  • Meter Settings on Main PM Tab 
  • Meter Frequency Settings 
  • Calculating Next Due Dates 
  • Time and Meter Based Frequencies 
  • Meter Rollover 
  • Meter Reading Rolldown and Reset 

 

Demonstration:  CR – Classroom Trainingeating PMs 

 

Module 4: Job Plan Sequencing 

  • Discuss how to setup job plan sequencing and its different  components 
  • DesCR – Classroom Trainingibe Job Plan Sequencing numbers 
  • Explore the PM counter 
  • Overview of PM forecast 

 

Module 5: Master PMs 

  • Discuss the concept of the Master PM and associated PMs 
  • Overview of tabs on the Master PM application 
  • DesCR – Classroom Trainingibe  the Master PM with the Rotating Items 
  • DesCR – Classroom Trainingibe the Master PM with Asset Templates 
  • Demonstration:  CR – Classroom Trainingeating Master PMs 

 

Student Exercises: Labs 1-2 PM Options, Master PMs and Time Based PMs 

 

Module 6: PM Hierarchies  

  • Concept of the PM Hierarchies 
  • PM Hierarchy structure and conditions 
  • PM Hierarchy Processing rule 
  • CR – Classroom Trainingeating a PM hierarchy 
  • Removal of a PM from the Hierarchy 

 

Module 7: PM Forecasting 

  • PM Forecasting Logic 
  • Ways to Generate PM Forecast 
  • Forecast Edit Rules 
  • Deleting Forecast 
  • Impact on Hierarchies and Duplicated PMs 
  • Generating Forecast Costs 

 

Student Exercises: Labs 4 & 5 – PM Forecasting and Generate WO from a PM 

 

Module 8: PM Options  

  • Automatic Work Order Generation via a PM 
  • Other PM Options 
  • Demonstration:  PM With Routes 

 

Student Exercises: Lab 6 – CR – Classroom Trainingeate Time Based PM with a Route 

  

Module 9: PMs and Condition Monitoring for Linear Assets  

  • Linear Assets – Recap 
  • PMs using Linear Assets 
  • Condition Monitoring using Linear Assets 

 

Demonstration:  PM Auto WO Generation Demo 

 

Student Exercises: Lab 7 – CR – Classroom Trainingeate a Meter Based PM 

 

Module 10: Repair Facilities  

  • Enabling Repair Facilities 
  • Capabilities 
  • Configuring a Repair Facility Location 
  • Using Repair Facilities in PMs 

 

Module 11: Condition Monitoring  

  • Concept of Condition Monitoring 
  • Setting up the Condition Monitoring 
  • Work Order generation from Condition Monitoring 

 

Demonstration:  Condition Monitoring 

 

Student Exercises: Lab 8 – Condition Monitoring 

Objective:

  • Discuss the Preventive Maintenance process and applications
  • CR – Classroom Trainingeate time-based preventive maintenance schedules
  • CR – Classroom Trainingeate meter based preventive maintenance schedules
  • Define Job Plan sequencing on a PM
  • CR – Classroom Trainingeate Master PMs
  • Discuss the usage of Repair Facilities
  • CR – Classroom Trainingeate Condition Monitoring Points
  • Automatically generate Work Orders from PMs and Condition Monitoring Points

Remarks:

Category:

Sustainability

Product Name:

IBM Maximo Application Suite

Badge and Certification Info:

66b7ce7b-dba4-4bcc-bc66-f7a6ee387697

Maximo Application Suite – Manage: Preventive Maintenance and Condition Monitoring – Code: MAX4324G

https://www.CR – Classroom Trainingedly.com/org/ibm/badge/maximo-application-suite-manage-preventive-maintena

https://images.CR – Classroom Trainingedly.com/images/2bfebf5c-653f-4e7a-998e-50d68614e3b7/image.png

0

Brand: 

Asset Management

Follow on Courses:

 

 

Replaced By:

MAX4324;MAX4324G;MAS; PMs; Master PMs; PM hierarchy, PM forecasting,

Cloud Pak Small

Lab Access Duration:

 

CRS is the top Global Training Provider for some of the world’s biggest brands.

Call Now +27 12 023 1959